Cooling

Evaporative cooling — pad and water sizing.

Compute pad face area, indicative water flow and expected ΔT from tunnel-fan cfm and outside conditions.

Inputs

Results

Pad face area
220.2 m²
Pad efficiency
75%
Inlet air ΔT
10.5 °C

Inlet 27.5 °C

Water flow
661 L/min
FAQ

Common questions

Wet-bulb is the ceiling?
Yes — evaporative cooling cannot reduce inlet air below the outside wet-bulb temperature. In humid climates the ΔT achievable is smaller than in dry climates.
Water use?
3 L/min per m² of pad is typical operating flow; you'll also carry bleed-off for water quality management.