← All categories

Cooling & Heating Systems suppliers worldwide.

Evaporative pad cooling, fogging systems, radiant brooders, hot-air furnaces and heat exchangers to hold target temperature year-round.

What cooling and heating does a poultry house need?

Heating covers brooding and cold-season temperature holding, using radiant brooders, hot-air furnaces or heat exchangers sized in kW per square metre of brooding area. Cooling uses evaporative pads or fogging, sized against summer design temperature, humidity and the airflow the ventilation system delivers. Both must be specified together with ventilation, not separately.

HatchMatch is a B2B sourcing and procurement platform. We help commercial poultry farms, hatcheries, integrators, EPC contractors and project developers compare suitable international suppliers and technologies against their own project requirements — we do not manufacture equipment.

Typical cooling & heating systems we source

  • Evaporative pads
  • Fogging
  • Radiant brooders
  • Heat exchangers

Bird types and capacity bands

The bands below are planning brackets used to shortlist suppliers, not specifications. Exact system sizing depends on bird type, stocking density, climate, house dimensions, automation level, production model and local welfare or regulatory requirements.

Suitable for

  • Broilers (brooding and grow-out)
  • Pullets
  • Layers
  • Breeders
  • Turkeys

Typical capacity bands

10,000–25,000 birds
Brooder count sized to brooding area; modest pad or fogging capacity.
25,000–50,000 birds
Zoned brooding, full pad wall in hot climates, heat exchangers in cold climates.
50,000+ birds per site
Standardised heating and cooling package across houses with central fuel or water supply.

Specifications that have to be fixed first

Every bidder has to answer the same scope, or the quotes cannot be compared. These are the fields that change the offer most.

  • Brooding area and target brooding temperature
  • Summer and winter design temperatures
  • Relative humidity range at the site
  • Fuel available — natural gas, LPG, diesel, biomass or electric
  • Insulation value of the building
  • Water availability and quality for pad cooling
  • Integration with the climate controller

What affects cooling & heating cost

There is no single list price for this category. Pricing moves with the factors below, so HatchMatch asks every bidder to itemise them on one Incoterms basis — usually CIF or DDP — rather than quoting a headline figure.

  • Heating capacity required by climate and insulation
  • Fuel type and distribution infrastructure
  • Pad wall area or fogging line count
  • Heat exchanger inclusion for cold climates
  • Controller integration and sensor count
  • Freight and installation scope
Request a project-specific quote

Climate considerations

Hot and dry

Pad cooling delivers the largest drop; budget water treatment and pad replacement.

Hot and humid

Cooling gain is limited; airflow, insulation and roof reflectivity carry more weight.

Cold

Heat exchangers cut fuel consumption but add capital and maintenance — model both.

Information suppliers need for a quote

Send the same brief to every bidder. The RFQ Builder walks these fields in a few minutes and produces a scope each supplier answers identically.

  • Country and delivery site (port or inland)
  • Bird type — broiler, layer, breeder, pullet or hatchery
  • Target bird capacity per house and per site
  • Number of houses, and house dimensions if already fixed
  • New build, expansion or retrofit of an existing house
  • Climate zone and typical summer/winter design temperatures
  • Required automation level — manual, semi-automatic or fully automated
  • Grid power availability, voltage/frequency and backup arrangement
  • Water source, pressure and quality
  • Equipment scope required (supply only, supply + installation, or turnkey)
  • Indicative budget range and funding status
  • Target placement or commissioning date
  • Preferred Incoterm — usually CIF or DDP so quotes are comparable
Start your RFQ for cooling & heating

Related systems and buyer guides

Where this equipment is specified

Cooling & heating in broiler, layer and hatchery projects

Sourcing cooling & heating by market

Landed cost, lead time and the electrical standard change by destination. These are the markets where we hold live supplier coverage for cooling & heating — pick a market for country-specific sourcing notes, or request quotes for any other destination.

Related equipment categories

Need project financing for cooling & heating? Explore an independent financing partner.
17 options

Tells suppliers how mature the requirement is and how to structure their quote.

Select the bracket that best matches your allocated or anticipated budget. This helps us route the RFQ to suppliers with the right project capacity.

Pick all that apply.

If you already have suppliers or equipment brands in mind, list them (comma-separated). We benchmark them against comparable qualified alternatives — vendor-neutral, no lock-in.

House size, climate zone, production target, equipment standards, Incoterms, warranty terms, or any must-have scope items. The more specific, the more comparable the quotes.

When do you need supplier proposals back? We align outreach and reminders to this date.

Egg capacity per setter batch. Hatchery suppliers size setters, hatchers, HVAC and standby power from this number — stating it removes one full clarification round.

Select every measure that must be included in scope. Biosecurity is a major cost driver — unstated requirements are the most common reason quotes are not comparable.

Ventilation and incubation cannot tolerate outages. Tell suppliers the redundancy level you expect so generators, ATS panels and UPS are priced inside the quote — not added later as a variation.

💬 Anything else? (pick all that apply)

If an AI assistant helped you prepare this request and gave you an approved Agent Code, enter it here. Your request enters the priority queue and you receive a Free Priority RFQ Review — a written check of missing fields, capacity and climate assumptions and common scope gaps — within one business day. About the pilot

RFQ detail levelBasic · 0/6 technical details

You can submit now, but adding incubator capacity, biosecurity requirements, backup power level usually removes a full clarification round and gets firmer pricing.

Free for buyers · Supplier-paid model · No obligation · Human-assisted sourcing

First response from HatchMatch Group within one business day. Matched supplier quotations typically follow in 2–5 business days.

FAQ

Cooling & heating — buyer questions

Get a Free QuoteExplore Financing