United Arab Emirates · Tier B market

Specification-led automated facilities for coastal desert conditions

The strongest fit is a high-automation broiler, layer or breeder facility where cooling water, traceability, energy performance and commissioning are contracted as one coordinated scope.

What decides the purchase

Coastal wet-bulb reduces evaporative cooling benefit despite extreme dry-bulb temperatures, making water treatment and system calculations decisive.

Put this in the RFQ

Require calculations at site wet-bulb, water analysis, energy load, redundancy philosophy, traceability outputs and one accountable commissioning matrix.

Direct answer

A 100,000-bird automated broiler project in United Arab Emirates needs about 4 houses of 25,000 birds (14 m × 123 m each, 6,897 m² total), roughly 2,375 t of feed per year, 92.7 m³ of water per peak day, and an indicative CAPEX of $1.38M – $2.38M. Design conditions used: 46 °C dry-bulb, 30 °C wet-bulb, 12 °C winter minimum.

  • — Coastal wet-bulb is high despite the desert climate — evaporative cooling is far less effective than in inland Gulf sites.
  • — Projects are specification-led: automation, traceability and energy performance decide the tender.
  • — Water treatment and cooling water quality must be engineered up front.

Model the United Arab Emirates project scope

Where is the project located?

Country changes the climate design, cost index and equipment scope.

Next steps

United Arab Emirates poultry project FAQ

Get a Free QuoteExplore Financing