Financing guide
Nigeria · Tier A market

Power-resilient broiler and layer projects with a landed-cost plan

The practical opportunity is a commercial farm sized around dependable feed, water and self-generated power, with the route from port to site costed before equipment selection.

What decides the purchase

Generator fuel, inland freight, currency exposure and spare-parts lead time can outweigh a small difference in factory price.

Put this in the RFQ

Require full connected load, generator duty, critical spares, named delivery point, installation responsibility and a landed-cost breakdown in every offer.

Direct answer

A 100,000-bird automated broiler project in Nigeria needs about 4 houses of 25,000 birds (14 m × 132 m each, 7,407 m² total), roughly 2,375 t of feed per year, 35.5 m³ of water per peak day, and an indicative CAPEX of $1.32M – $2.28M. Design conditions used: 36 °C dry-bulb, 27 °C wet-bulb, 18 °C winter minimum.

  • — Assume the farm runs on generator for a material share of the year; fuel dominates OPEX.
  • — Solar plus storage is worth modelling for lighting, pumps and controllers.
  • — Import duty and inland logistics materially raise landed equipment cost.

Model the Nigeria project scope

Where is the project located?

Country changes the climate design, cost index and equipment scope.

Next steps