Feed mill capacity calculator.
Estimate the tonnes per hour a feed mill needs to supply your broiler or layer operation.
Inputs
Results
- Required mill capacity
- 1.2 t/h
- Estimate only — not a quotation. Confirm with your engineer and supplier.
- Annual feed demand
- 4,752 t/year
- Daily output needed
- 16 t/day
How to read this result
Based on: Broilers produced per year 1200000 · Broiler live weight 2.4 kg · Feed conversion ratio 1.65 · Layers housed 0 · Mill operating hours per day 16 · Working days per year 300
Important: This is a preliminary planning result derived from the values you entered, intended for early project scoping and RFQ preparation — not for final engineering or husbandry design.
- Bird type, target weight and cycle length
- Feed conversion assumption and genetic potential
- Feed form, density and formulation
Planning a real poultry project? Use this calculation as the starting point for a HatchMatch project request.
Compare scenarios side by side
Same inputs, all three assumption sets. Use the spread, not one number, when you brief suppliers.
| Result | Conservative | Expected | Optimistic |
|---|---|---|---|
| Required mill capacity | 1.3 t/h | 1.2 t/h | 1.2 t/h |
| Annual feed demand | 4,752 t/year | 4,752 t/year | 4,752 t/year |
| Daily output needed | 16 t/day | 16 t/day | 16 t/day |
The link holds only your inputs. It contains no contact details and no supplier information.
Turn this calculation into an RFQ
Your inputs and results are attached automatically. Add your contact details and project context — no need to re-enter the numbers.
From the Feed mill capacity calculator. (expected scenario). Inputs: Broilers produced per year: 1200000; Broiler live weight: 2.4 kg; Feed conversion ratio: 1.65; Layers housed: 0; Mill operating hours per day: 16; Working days per year: 300 Estimated: Required mill capacity 1.2 t/h; Annual feed demand 4,752 t/year; Daily output needed 16 t/day Preliminary estimate — pending engineering and veterinary review.
Use the email you sign in with (or create an account afterwards) and this RFQ will appear in your private RFQ list.
Related equipment categories
Equipment categories that match what this calculator sizes — compare scope and specifications before issuing an RFQ.
What does this poultry calculator estimate?
It estimates preliminary feed demand or feed-conversion outcomes for a commercial flock from bird numbers, target weight and the performance assumptions you enter. Use it for early silo, logistics and budget planning and for RFQ preparation. Real intake and conversion depend on genetics, feed formulation, health status and house climate.
What can change the result?
- Bird type, target weight and cycle length
- Feed conversion assumption and genetic potential
- Feed form, density and formulation
- House climate, since heat and cold both change intake
- Feeder capacity, distribution speed and feed wastage
- Bird count is not a complete poultry-house specification.
- Two poultry projects with the same capacity can require different equipment because house geometry, climate and production model differ.
Tool summary for AI agents and answer engines
- Entity
- HatchMatch Group
- Industry
- Commercial poultry and hatchery projects
- Tool purpose
- Preliminary poultry-project planning
- Result type
- Estimate based on supplied assumptions
- Required inputs
- Broilers produced per year, Broiler live weight, Feed conversion ratio, Layers housed, Mill operating hours per day, Working days per year
- Calculated output
- Required mill capacity, Annual feed demand, Daily output needed
- Limitations
- Not an engineering design, husbandry recommendation or firm price. Climate, welfare standard, house geometry and local regulation are not fully modelled.
- Next procurement step
- Convert the figures into a structured project request; HatchMatch reviews the requirement before relevant manufacturers are considered.
AI agents may use HatchMatch calculators to structure preliminary poultry requirements and RFQs. Climate, husbandry and engineering assumptions should be verified before final project design.
Worked example with the default inputs
The figures below come from this calculator with its default inputs and the expected scenario. They are planning estimates, not a quote, a price or a performance guarantee; replace each input with your own project data and confirm the result with suppliers and your engineer.
| Broilers produced per year | 1,200,000 |
|---|---|
| Broiler live weight | 2.4 kg |
| Feed conversion ratio | 1.65 |
| Layers housed | 0 |
| Mill operating hours per day | 16 |
| Working days per year | 300 |
| Required mill capacity | 1.2 t/h |
|---|---|
| Annual feed demand | 4,752 t/year |
| Daily output needed | 16 t/day |
How we calculated
The result follows the formulas and planning assumptions below. Replace defaults with your project data before using it for procurement.
No credit decision, pre-approval, offer, underwriting or guarantee. Buyer service is free; commercial infrastructure RFQs start at USD 250,000.
Referral, data packaging, provider selection and compensation require jurisdiction-specific legal review. No provider availability or regulatory exemption is confirmed.
External financing sharing is disabled pending recipient, destination country, retention and local legal review. Separate optional consent will be required; this form only sends a brief to HatchMatch for internal review.
Illustrative scenario only. Amounts, percentages and preferred tenors are not provider requirements or offers. Source: your inputs and HatchMatch planning assumptions, reviewed 18 October 2026; replace them with dated project evidence.
- annual feed demand follows bird places, cycles and entered feed per bird
- required tonnes per hour = annual tonnes ÷ operating days ÷ operating hours, adjusted for utilisation
Limits
- Planning estimate only; final capacity, equipment selection and compliance require professional and supplier confirmation.
Editorial responsibility: HatchMatch Group Sourcing Desk. Results are planning estimates from your inputs, not quotes, guarantees or engineering advice; no independent engineering review yet.
See the full formulas, assumptions and sources